Skip to content
GR Enterprises - Solar Powering a Brighter Tomorrow
Modern Indian home with a rooftop solar system and the homeowner on the terrace

Rooftop solar for homes · Rohtak, Haryana

Solar panels for homesin Rohtak.

Rohtak me independent floors aur kothiyon par rooftop solar lagwakar garmiyon ka bijli bill 90% tak zero karein. UHBVN net-metering aur national portal subsidy ka saara documentation hamari local team handle karti hai.
Sun hours/day
5.3
Units/kW/month
~127
Max subsidy
₹78,000
Rooftop feasibility survey

Free solar survey in Rohtak

A solar engineer will call you within one working day.

+91

10-digit mobile number

Free surveyNo obligationYour number stays private

DURASOL AUTHORIZED DISTRIBUTORTATA · ADANI · UTL · EASTMAN TIER-1 SOLAR30-YEAR PERFORMANCE WARRANTY10*-YEAR INVERTER WARRANTYDHBVN & UHBVN NET-METERING HANDLEDPM SURYA GHAR DBT REGISTERED150 KM/H WIND GI STEEL STRUCTURESLIVE GENERATION MOBILE APP

Rohtak solar economics

What a rooftop system saves in Rohtak

Based on Rohtak's average sunshine of 5.3 kWh/kWp/day and a residential tariff of about ₹7.5/unit (UHBVN (Uttar Haryana Bijli Vitran Nigam)).

Solar generation and savings by system size in Rohtak
SYSTEMUNITS / MONTHSAVING / MONTHNET COST AFTER SUBSIDYPAYBACK
2 kW254₹1,908₹60,0002.8 yrs
3 kW382₹2,862₹1.02 L3.1 yrs
5 kW636₹4,770₹2.02 L3.7 yrs

Indicative figures. Exact numbers depend on your roof, load and the equipment chosen.

Interactive Solar Yield & Subsidy Simulator

Calculate your 30-year solar savings & subsidy.

Move the slider to match your average monthly power bill and instantly see your recommended system size, subsidy, and lifetime returns.

Average Monthly Power Bill₹4,500
MIN ₹1,000MAX ₹30,000
Recommended Capacity

4.5kW

Roof Footprint

300 sq ft

Module Count

9 × 550 W

Monthly Power Bill Savings
₹4,275
Estimated Payback Horizon
3.5 years
System Cost (Pre-Subsidy)
₹2.55 L
Central PM Surya Ghar Subsidy
− ₹78,000
30-Year Cumulative Yield
₹22.47 L
30-Yr CO₂ Footprint Avoided
162 tonnes

Turnkey Engineering Protocol

From site survey to power generation in four weeks.

Every installation follows strict MNRE guidelines with zero-leakage chemical anchoring and certified wind-speed structures.

Solar engineer measuring a rooftop with a laser meter while the homeowner watches
DAY 1
01/DAY 1

On-Site Rooftop Survey

Certified solar engineer inspects roof orientation, shadow-free area, DISCOM sanction, and structural load feasibility.

Solar consultant showing a 3D rooftop design on a laptop to an Indian couple
DAY 2–4
02/DAY 2–4

Engineering Layout & Turnkey Quote

Custom 3D CAD layout with shadow analysis, expected monthly kWh generation, and transparent turnkey BOQ pricing.

Installers in safety harnesses fixing a solar panel onto its mounting structure
WEEK 2–3
03/WEEK 2–3

Net-Metering & Subsidy

Complete liaison for DHBVN/UHBVN bi-directional meter sanction and PM Surya Ghar national portal DBT subsidy filing.

Grandmother and son checking solar generation on a phone app on their terrace
30 YEARS
04/30 YEARS

Commissioning & Lifetime Care

Live mobile app telemetry, 30-year panel warranty, 10-year inverter warranty, and 5 years complimentary maintenance.

Verified Customer Reviews

What our customers say

Hear directly from families and commercial proprietors across Haryana who switched to rooftop solar with GR Enterprises and slash their electricity bills by up to 90%.

  • “The team showed me the 3D design before anything was drilled. Installation took two days, the subsidy reached my account in six weeks, and my summer bill dropped from ₹6,800 to ₹420.”
    BILL: ₹6,800 → ₹4205 kW
    R
    Rakesh AgarwalJaipur · Home
  • “I'd heard subsidy paperwork was a nightmare. GR filed everything on the portal and kept me updated on WhatsApp at every step. We got the central and the UP state subsidy.”
    BILL: ₹3,900 → ₹3003 kW
    N
    Neha SrivastavaLucknow · Home
  • “A 60 kW plant now runs our lifts, pumps and common lighting. Our common-area bill has fallen by about 70% and the maintenance charge for residents went down this year.”
    BILL: ₹1,85,000 → ₹52,00060 kW
    S
    Sunrise Heights RWANoida · Housing society

Coverage & Reach

Complete Solar EPC Coverage Across Rohtak & Surrounding Villages

GR Enterprises delivers direct on-site rooftop surveys, UHBVN/DHBVN net-metering liaison, and 30-year guaranteed installations across all sectors, colonies, tehsils, and rural village clusters in the Rohtak region.

Urban Sectors & Colonies

Key residential and commercial sectors in Rohtak

  • Model Town
  • Sector 1
  • Sector 14
  • Sector 2-3
  • Delhi Road
  • Subhash Nagar
  • Medical Mor
  • Sheetal Nagar

Tehsils & Rural Villages

Rural Subsidy

Direct village surveys & agricultural tube-well solar

  • Model Town
  • Sector 1
  • Sector 14
  • Sector 2-3
  • Delhi Road
  • Subhash Nagar
  • Medical Mor
  • Sheetal Nagar
Rural Solar Service Commitment

Living in a village or farmhouse near Rohtak?

Our certified solar engineers bring digital shadow-analysis and rooftop feasibility vans directly to your village within 24 hours. We handle full rural domestic net-metering paperwork with UHBVN (Uttar Haryana Bijli Vitran Nigam) sub-divisional offices, agricultural tube-well solar installations, and high-wind structural reinforcements.

100% Free Survey · No Obligation

Solar Knowledge Base

Home solar in Rohtak: FAQs

Clear, transparent answers about PM Surya Ghar central subsidies, DHBVN/UHBVN net-metering approvals, storm-tested mounts, and 30 years performance warranty.

Need immediate technical guidance?Call an engineer at +91 72909 08088

How much does a 3 kW solar system cost in Rohtak?

A 3 kW on-grid rooftop system in Rohtak typically costs ₹1.8–2.1 lakh before subsidy. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is about ₹1.1–1.4 lakh, depending on panel type and structure height. PM Surya Ghar scheme ke tahat ₹78,000 subsidy direct Aadhaar-linked bank account me.

How many units does 1 kW of solar generate in Rohtak?

Rohtak receives about 5.3 peak sun hours a day, so 1 kW of solar generates roughly 4.2 units a day, or about 127 units a month on average across the year.

Which DISCOM handles net-metering in Rohtak?

Net-metering in Rohtak is handled by UHBVN (Uttar Haryana Bijli Vitran Nigam). GR Enterprises prepares and files the application, coordinates the inspection and arranges installation of the bidirectional meter.

Do you install solar in all areas of Rohtak and nearby villages?

Yes. We install across Rohtak urban sectors as well as surrounding tehsils and villages including . We coordinate directly with local rural sub-division offices and site surveys are 100% free.

Can farmhouses and rural homes near Rohtak install hybrid solar with battery backup?

Yes. For agricultural farmhouses and rural properties around Rohtak that encounter voltage fluctuations or scheduled rural power cuts, we install Hybrid and Off-Grid solar plants with lithium/tubular battery banks to keep lights, refrigerators, and water pumps running smoothly 24/7.

Which is better for a home: on-grid, off-grid or hybrid?

On-grid is best for most city homes with reliable power: it is the cheapest, qualifies for subsidy and uses net-metering. Hybrid adds battery backup for frequent outages. Off-grid suits locations without a grid connection.

Will solar work in monsoon or on cloudy days?

Yes, at a reduced output. Panels still generate on cloudy days, typically 20–40% of normal. Annual generation already accounts for monsoon months, so your yearly savings estimate stays accurate.

What is PM Surya Ghar: Muft Bijli Yojana?

It is the Government of India's rooftop solar scheme for households. It provides ₹30,000/kW for the first 2 kW and ₹18,000 for the third kW, up to a maximum of ₹78,000 for systems of 3 kW and above, credited directly to the homeowner's bank account.

Who is eligible for the subsidy?

Indian households with their own roof suitable for solar, a valid electricity connection in their name, and who have not availed any other solar subsidy. The system must be installed by a registered vendor using DCR (domestic content) panels.

How long does the subsidy take to arrive?

Usually 30–60 days after the net-meter is installed and the system is inspected. We file the application on the national portal and track it for you until it is credited.

Complimentary On-Site Solar Feasibility Survey

Book a free solar survey in Rohtak.

Our solar engineers will inspect your rooftop, prepare an accurate generation report, and calculate your exact PM Surya Ghar subsidy — with zero sales pressure.

What happens during your site survey?

3-Point Rooftop Inspection Protocol

01

Free Onsite Rooftop Feasibility Survey

An engineer visits your property to inspect solar irradiance, roof orientation, and usable shadow-free terrace area.

02

Verified ROI & Generation Report

Transparent monthly generation forecast, Tier-1 equipment specifications, and payback model without hidden markups.

03

Zero DHBVN / UHBVN Bureaucracy

From submitting net-metering applications to coordinating DISCOM inspections and subsidy release — we manage everything.

Zero buying obligationCertified engineer visit