
Rooftop solar for homes · Rohtak, Haryana
Solar panels for homesin Rohtak.
- Sun hours/day
- 5.3
- Units/kW/month
- ~127
- Max subsidy
- ₹78,000
Free solar survey in Rohtak
A solar engineer will call you within one working day.
Rohtak solar economics
What a rooftop system saves in Rohtak
Based on Rohtak's average sunshine of 5.3 kWh/kWp/day and a residential tariff of about ₹7.5/unit (UHBVN (Uttar Haryana Bijli Vitran Nigam)).
| SYSTEM | UNITS / MONTH | SAVING / MONTH | NET COST AFTER SUBSIDY | PAYBACK |
|---|---|---|---|---|
| 2 kW | 254 | ₹1,908 | ₹60,000 | 2.8 yrs |
| 3 kW | 382 | ₹2,862 | ₹1.02 L | 3.1 yrs |
| 5 kW | 636 | ₹4,770 | ₹2.02 L | 3.7 yrs |
Indicative figures. Exact numbers depend on your roof, load and the equipment chosen.
Calculate your 30-year solar savings & subsidy.
Move the slider to match your average monthly power bill and instantly see your recommended system size, subsidy, and lifetime returns.
4.5kW
300 sq ft
Module Count9 × 550 W
- Monthly Power Bill Savings
- ₹4,275
- Estimated Payback Horizon
- 3.5 years
- System Cost (Pre-Subsidy)
- ₹2.55 L
- Central PM Surya Ghar Subsidy
- − ₹78,000
- 30-Year Cumulative Yield
- ₹22.47 L
- 30-Yr CO₂ Footprint Avoided
- 162 tonnes
Turnkey Engineering Protocol
From site survey to power generation in four weeks.
Every installation follows strict MNRE guidelines with zero-leakage chemical anchoring and certified wind-speed structures.
DAY 1On-Site Rooftop Survey
Certified solar engineer inspects roof orientation, shadow-free area, DISCOM sanction, and structural load feasibility.
DAY 2–4Engineering Layout & Turnkey Quote
Custom 3D CAD layout with shadow analysis, expected monthly kWh generation, and transparent turnkey BOQ pricing.
WEEK 2–3Net-Metering & Subsidy
Complete liaison for DHBVN/UHBVN bi-directional meter sanction and PM Surya Ghar national portal DBT subsidy filing.
30 YEARSCommissioning & Lifetime Care
Live mobile app telemetry, 30-year panel warranty, 10-year inverter warranty, and 5 years complimentary maintenance.
Verified Customer Reviews
What our customers say
Hear directly from families and commercial proprietors across Haryana who switched to rooftop solar with GR Enterprises and slash their electricity bills by up to 90%.
“The team showed me the 3D design before anything was drilled. Installation took two days, the subsidy reached my account in six weeks, and my summer bill dropped from ₹6,800 to ₹420.”
BILL: ₹6,800 → ₹4205 kWR Rakesh AgarwalJaipur · Home“I'd heard subsidy paperwork was a nightmare. GR filed everything on the portal and kept me updated on WhatsApp at every step. We got the central and the UP state subsidy.”
BILL: ₹3,900 → ₹3003 kWN Neha SrivastavaLucknow · Home“A 60 kW plant now runs our lifts, pumps and common lighting. Our common-area bill has fallen by about 70% and the maintenance charge for residents went down this year.”
BILL: ₹1,85,000 → ₹52,00060 kWS Sunrise Heights RWANoida · Housing society
Coverage & Reach
Complete Solar EPC Coverage Across Rohtak & Surrounding Villages
GR Enterprises delivers direct on-site rooftop surveys, UHBVN/DHBVN net-metering liaison, and 30-year guaranteed installations across all sectors, colonies, tehsils, and rural village clusters in the Rohtak region.
Urban Sectors & Colonies
Key residential and commercial sectors in Rohtak
- Model Town
- Sector 1
- Sector 14
- Sector 2-3
- Delhi Road
- Subhash Nagar
- Medical Mor
- Sheetal Nagar
Tehsils & Rural Villages
Rural SubsidyDirect village surveys & agricultural tube-well solar
- Model Town
- Sector 1
- Sector 14
- Sector 2-3
- Delhi Road
- Subhash Nagar
- Medical Mor
- Sheetal Nagar
Living in a village or farmhouse near Rohtak?
Our certified solar engineers bring digital shadow-analysis and rooftop feasibility vans directly to your village within 24 hours. We handle full rural domestic net-metering paperwork with UHBVN (Uttar Haryana Bijli Vitran Nigam) sub-divisional offices, agricultural tube-well solar installations, and high-wind structural reinforcements.
100% Free Survey · No Obligation
ALSO IN ROHTAK
Commercial & industrial solar in Rohtak →
OTHER HARYANA CITIES WE SERVE
Solar Knowledge Base
Home solar in Rohtak: FAQs
Clear, transparent answers about PM Surya Ghar central subsidies, DHBVN/UHBVN net-metering approvals, storm-tested mounts, and 30 years performance warranty.
How much does a 3 kW solar system cost in Rohtak?
A 3 kW on-grid rooftop system in Rohtak typically costs ₹1.8–2.1 lakh before subsidy. After the PM Surya Ghar central subsidy of ₹78,000, the effective cost is about ₹1.1–1.4 lakh, depending on panel type and structure height. PM Surya Ghar scheme ke tahat ₹78,000 subsidy direct Aadhaar-linked bank account me.
How many units does 1 kW of solar generate in Rohtak?
Rohtak receives about 5.3 peak sun hours a day, so 1 kW of solar generates roughly 4.2 units a day, or about 127 units a month on average across the year.
Which DISCOM handles net-metering in Rohtak?
Net-metering in Rohtak is handled by UHBVN (Uttar Haryana Bijli Vitran Nigam). GR Enterprises prepares and files the application, coordinates the inspection and arranges installation of the bidirectional meter.
Do you install solar in all areas of Rohtak and nearby villages?
Yes. We install across Rohtak urban sectors as well as surrounding tehsils and villages including . We coordinate directly with local rural sub-division offices and site surveys are 100% free.
Can farmhouses and rural homes near Rohtak install hybrid solar with battery backup?
Yes. For agricultural farmhouses and rural properties around Rohtak that encounter voltage fluctuations or scheduled rural power cuts, we install Hybrid and Off-Grid solar plants with lithium/tubular battery banks to keep lights, refrigerators, and water pumps running smoothly 24/7.
Which is better for a home: on-grid, off-grid or hybrid?
On-grid is best for most city homes with reliable power: it is the cheapest, qualifies for subsidy and uses net-metering. Hybrid adds battery backup for frequent outages. Off-grid suits locations without a grid connection.
Will solar work in monsoon or on cloudy days?
Yes, at a reduced output. Panels still generate on cloudy days, typically 20–40% of normal. Annual generation already accounts for monsoon months, so your yearly savings estimate stays accurate.
What is PM Surya Ghar: Muft Bijli Yojana?
It is the Government of India's rooftop solar scheme for households. It provides ₹30,000/kW for the first 2 kW and ₹18,000 for the third kW, up to a maximum of ₹78,000 for systems of 3 kW and above, credited directly to the homeowner's bank account.
Who is eligible for the subsidy?
Indian households with their own roof suitable for solar, a valid electricity connection in their name, and who have not availed any other solar subsidy. The system must be installed by a registered vendor using DCR (domestic content) panels.
How long does the subsidy take to arrive?
Usually 30–60 days after the net-meter is installed and the system is inspected. We file the application on the national portal and track it for you until it is credited.

Book a free solar survey in Rohtak.
Our solar engineers will inspect your rooftop, prepare an accurate generation report, and calculate your exact PM Surya Ghar subsidy — with zero sales pressure.
What happens during your site survey?
3-Point Rooftop Inspection Protocol
Free Onsite Rooftop Feasibility Survey
An engineer visits your property to inspect solar irradiance, roof orientation, and usable shadow-free terrace area.
Verified ROI & Generation Report
Transparent monthly generation forecast, Tier-1 equipment specifications, and payback model without hidden markups.
Zero DHBVN / UHBVN Bureaucracy
From submitting net-metering applications to coordinating DISCOM inspections and subsidy release — we manage everything.