
Grid-Tied Clean Energy • 30-Yr Warranty
On-Grid Rooftop Solar.Zero Battery Costs. Highest ROI.
- Max Subsidy
- ₹78,000
- Battery Cost
- ₹0
- Payback Period
- 3–4 Yrs
- Panel Warranty
- 30 Years
Book Free On-Grid Feasibility Audit
A solar engineer will call you within one working day.
How It Works
The Engineering Architecture of On-Grid Solar
An on-grid solar power plant synchronizes with your local DISCOM line (DHBVN/UHBVN) to power your appliances while seamlessly trading energy with the grid.
1. Daytime Generation
High-efficiency Mono PERC solar panels convert Haryana sunlight into DC electricity. A high-efficiency on-grid inverter immediately transforms this into 230V/415V AC electricity.
2. Bi-Directional Export
When your solar system produces more electricity than your home consumes, surplus energy is pushed back into the utility grid through an authorized bidirectional net-meter.
3. Nighttime Utility Grid
At night or during heavy fog, your property draws power from the grid automatically. At the end of the billing cycle, your exported units are subtracted from consumed units.
Why 85% of Homeowners Choose On-Grid Solar
Lowest Capital Outlay
No expensive lead-acid or lithium battery banks required, reducing setup cost by 40%.
Rapid 3-Year Payback
With high daytime utility tariffs in Haryana (₹7.5–₹9.8/unit), capital pays back in 36 to 48 months.
₹78,000 Central DBT
100% eligible for direct central financial assistance under PM Surya Ghar Yojana.
Zero Battery Replacement
No battery degradation or recurrent replacement expenses every 4–5 years.
30-Year Performance Warranty
DCR Mono PERC modules backed by 30-year performance warranties & 10*-year inverter warranty.
Turnkey Net-Meter Liaison
GR Enterprises handles transformer sanctions, DISCOM inspections, and meter synchronization.
Certified Manufacturing Partners
Authorized Channel Partners & Direct Distributors
Direct manufacturer supply with Tier-1 BIS-certified solar modules and inverters — backed by 30 years performance warranty and 10*-year inverter warranty.
Authorized Distributor for Durasol Solar





Calculate your 30-year solar savings & subsidy.
Move the slider to match your average monthly power bill and instantly see your recommended system size, subsidy, and lifetime returns.
4.5kW
300 sq ft
Module Count9 × 550 W
- Monthly Power Bill Savings
- ₹4,275
- Estimated Payback Horizon
- 3.5 years
- System Cost (Pre-Subsidy)
- ₹2.55 L
- Central PM Surya Ghar Subsidy
- − ₹78,000
- 30-Year Cumulative Yield
- ₹22.47 L
- 30-Yr CO₂ Footprint Avoided
- 162 tonnes
Turnkey Engineering Protocol
From site survey to power generation in four weeks.
Every installation follows strict MNRE guidelines with zero-leakage chemical anchoring and certified wind-speed structures.
DAY 1On-Site Rooftop Survey
Certified solar engineer inspects roof orientation, shadow-free area, DISCOM sanction, and structural load feasibility.
DAY 2–4Engineering Layout & Turnkey Quote
Custom 3D CAD layout with shadow analysis, expected monthly kWh generation, and transparent turnkey BOQ pricing.
WEEK 2–3Net-Metering & Subsidy
Complete liaison for DHBVN/UHBVN bi-directional meter sanction and PM Surya Ghar national portal DBT subsidy filing.
30 YEARSCommissioning & Lifetime Care
Live mobile app telemetry, 30-year panel warranty, 10-year inverter warranty, and 5 years complimentary maintenance.
Verified Customer Reviews
Real On-Grid Solar Installations & Verified Reviews
Hear directly from families and commercial proprietors across Haryana who switched to rooftop solar with GR Enterprises and slash their electricity bills by up to 90%.
“A 60 kW plant now runs our lifts, pumps and common lighting. Our common-area bill has fallen by about 70% and the maintenance charge for residents went down this year.”
BILL: ₹1,85,000 → ₹52,00060 kWS Sunrise Heights RWANoida · Housing society“Our 250 kW rooftop plant paid back in just over three years. The generation data matches the proposal they gave us, and their O&M team visits every quarter without us asking.”
BILL: ₹5,20,000 → ₹2,10,000250 kWM Mehta TextilesAhmedabad · Industrial“Power cost is a big line item for a clinic. The 40 kW system brought it down sharply, and the hybrid backup keeps critical equipment running during outages.”
BILL: ₹98,000 → ₹34,00040 kWD Dr. Sameer KhannaGurugram · Commercial
Technical Clarity
On-Grid Solar Systems: Frequently Asked Questions
Clear, transparent answers about PM Surya Ghar central subsidies, DHBVN/UHBVN net-metering approvals, storm-tested mounts, and 30 years performance warranty.
What happens to excess electricity generated by my on-grid solar plant?
Excess power is automatically exported to your local electricity grid through a bi-directional net-meter. DHBVN or UHBVN credits these exported units against your consumption, slashing your monthly bill by up to 90%.
Does an on-grid solar system work during a grid power outage?
For utility worker safety, on-grid inverters feature anti-islanding protection and shut down during a grid failure to prevent sending voltage onto downed power lines. If you need power during blackouts, explore our Hybrid Solar System.
Is on-grid solar eligible for the ₹78,000 PM Surya Ghar subsidy?
Yes! On-grid residential rooftop solar systems with DCR-compliant panels are 100% eligible for the central subsidy under PM Surya Ghar: Muft Bijli Yojana, deposited directly into your bank account via DBT.
What is the warranty on an on-grid system installed by GR Enterprises?
We install strictly Tier-1 DCR modules (Tata, Adani, Durasol) backed by a 30-year linear performance warranty, alongside premium on-grid inverters (UTL, Eastman) with an official 10-year replacement guarantee.

Ready to Cut Your Electricity Bill by 90% with On-Grid Solar?
Our engineers will visit your roof in Haryana within 24 hours, prepare an exact CAD generation layout, and calculate your ₹78,000 subsidy.
What happens during your site survey?
3-Point Rooftop Inspection Protocol
Free Onsite Rooftop Feasibility Survey
An engineer visits your property to inspect solar irradiance, roof orientation, and usable shadow-free terrace area.
Verified ROI & Generation Report
Transparent monthly generation forecast, Tier-1 equipment specifications, and payback model without hidden markups.
Zero DHBVN / UHBVN Bureaucracy
From submitting net-metering applications to coordinating DISCOM inspections and subsidy release — we manage everything.