Skip to content
GR Enterprises - Solar Powering a Brighter Tomorrow
Factory and warehouse roofs covered with solar panels in an industrial area

Solar for industry · B2B

Megawatt-scale solar,engineered to the bolt.

Rooftop and ground-mount plants for factories and warehouses, delivered as turnkey EPC or a zero-investment RESCO model, with guaranteed generation and a dedicated O&M team.
Plant size
0.1–5 MW
Upfront (RESCO)
₹0
Monitoring
24×7
Rooftop feasibility survey

Talk to our industrial team

Share your details and a project engineer will call you to schedule a site visit.

+91

10-digit mobile number

Free surveyNo obligationYour number stays private

Engineering standards

What a factory owner should expect from an EPC partner.

  • Generation guarantee

    Contracted annual generation backed by PVsyst simulation, with compensation if the plant under-performs.

  • Structural certification

    Purlin-mounted or ballasted structures, with stability certified for your shed type: metal sheet, RCC or ground.

  • Grid & DG synchronisation

    Zero-export controllers and DG synchronisation, so solar works safely alongside your existing power setup.

  • SCADA monitoring

    String-level monitoring and dashboards with alerts for faults and under-performance.

  • Professional O&M

    Scheduled module cleaning, thermography, preventive maintenance and fast breakdown response.

  • Minimal shutdown

    Installation is planned around your production shifts, and the switchover is scheduled on a weekly off.

Project models

Choose how you want to own your power.

Turnkey EPC

Own the asset

Best for: Manufacturers who want the lowest lifetime cost per unit.

  • Design, supply, install and commission
  • Accelerated depreciation benefit*
  • Typical payback of 3–4 years
  • Optional long-term O&M contract

RESCO / PPA

Zero capex

Best for: Plants with steady daytime loads that prefer OPEX.

  • 15–25 year power purchase agreement
  • Fixed tariff below your grid rate
  • We own, insure and maintain the plant
  • Savings from day one

Ground-mount / open access

Best for: Large consumers without enough roof space.

  • Captive or group-captive structures
  • Land and transmission feasibility study
  • Subject to state open-access policy
  • MW-scale economics
Interactive Solar Yield & Subsidy Simulator

Calculate your 30-year solar savings & subsidy.

Move the slider to match your average monthly power bill and instantly see your recommended system size, subsidy, and lifetime returns.

Average Monthly Power Bill₹75,000
MIN ₹10,000MAX ₹10.00 L
Recommended Capacity

60kW

Roof Footprint

5,400 sq ft

Module Count

109 × 550 W

+ 49 MORE MODULES IN CAD LAYOUT

Monthly Power Bill Savings
₹71,250
Estimated Payback Horizon
3.2 years
Gross Capital Outlay (est.)
₹27.60 L
Tax Benefit (Accelerated Depr.)
40% Eligible*
30-Year Cumulative Yield
₹3.74 Cr
30-Yr CO₂ Footprint Avoided
2,160 tonnes

*Eligible under Section 32 of Income Tax Act for commercial tax depreciation.

Verified Customer Reviews

Plants that perform to the proposal.

Hear directly from families and commercial proprietors across Haryana who switched to rooftop solar with GR Enterprises and slash their electricity bills by up to 90%.

  • “Our 250 kW rooftop plant paid back in just over three years. The generation data matches the proposal they gave us, and their O&M team visits every quarter without us asking.”
    BILL: ₹5,20,000 → ₹2,10,000250 kW
    M
    Mehta TextilesAhmedabad · Industrial
  • “Power cost is a big line item for a clinic. The 40 kW system brought it down sharply, and the hybrid backup keeps critical equipment running during outages.”
    BILL: ₹98,000 → ₹34,00040 kW
    D
    Dr. Sameer KhannaGurugram · Commercial

Project lifecycle

How an industrial solar project runs.

Feasibility (week 1–2): site survey, roof and structural assessment, load profile analysis, DISCOM regulations review and a preliminary techno-commercial offer.

Engineering (week 2–4): detailed design, PVsyst generation report, single-line diagrams, structural drawings and approval submissions.

Execution (week 4–10): procurement of Tier-1 modules and inverters, installation by our in-house teams under a safety-first site plan, testing and commissioning.

Operations (30 years): monitoring, preventive maintenance, cleaning schedules and monthly performance reports against the guaranteed generation.

*Tax benefits depend on current law. Please consult your chartered accountant.

Solar Knowledge Base

Industrial solar, answered

Clear, transparent answers about PM Surya Ghar central subsidies, DHBVN/UHBVN net-metering approvals, storm-tested mounts, and 30 years performance warranty.

Need immediate technical guidance?Call an engineer at +91 72909 08088

What is the payback period for commercial solar?

With commercial tariffs of ₹9–11 per unit, most businesses recover their investment in 3–4 years. After that, the plant generates practically free electricity for 20+ years.

Can my business claim depreciation on solar?

Yes. Solar plants qualify for accelerated depreciation under the Income Tax Act, which lowers your effective cost further. Please confirm the current rate and your eligibility with your chartered accountant.

Do you offer zero-investment (RESCO/PPA) models?

For larger industrial loads, typically above 100 kW, we can arrange OPEX/RESCO models where you pay only for the units generated, at a tariff lower than your DISCOM rate, with no upfront investment.

Will installation disrupt our operations?

No. We plan installation around your shifts, and the switchover to solar takes a short planned shutdown, usually scheduled on a weekly off.

Complimentary On-Site Solar Feasibility Survey

Get a feasibility study for your plant.

Share your details. We'll review your load profile and visit your site.

What happens during your site survey?

3-Point Rooftop Inspection Protocol

01

Free Onsite Rooftop Feasibility Survey

An engineer visits your property to inspect solar irradiance, roof orientation, and usable shadow-free terrace area.

02

Verified ROI & Generation Report

Transparent monthly generation forecast, Tier-1 equipment specifications, and payback model without hidden markups.

03

Zero DHBVN / UHBVN Bureaucracy

From submitting net-metering applications to coordinating DISCOM inspections and subsidy release — we manage everything.

Zero buying obligationCertified engineer visit