
Government subsidy guide · Updated 2026
PM Surya Ghar:up to ₹78,000 for your roof.
- Up to 2 kW
- ₹30k/kW
- 3rd kW
- ₹18,000
- Maximum
- ₹78,000
Check your subsidy eligibility
A solar engineer will call you within one working day.
Government Subsidy Schedule
Up to ₹78,000 direct central subsidy credited to your bank account.
Under the Government of India's PM Surya Ghar: Muft Bijli Yojana, residential homeowners receive substantial financial assistance. As an authorized MNRE channel partner, GR Enterprises coordinates your national portal registration, DISCOM net-meter inspection, and Direct Benefit Transfer (DBT) release.
| SYSTEM CAPACITY | CENTRAL SUBSIDY | RECOMMENDED BILL RANGE |
|---|---|---|
| 1 kW | ₹30,000 | ₹800 – ₹1,500 |
| 2 kW | ₹60,000 | ₹1,500 – ₹2,500 |
| 3 kW | ₹78,000 | ₹2,500 – ₹4,000 |
| 3 kW and above - 10 kW | ₹78,000 | Above ₹4,000 |
Step by step
How to apply for the rooftop solar subsidy
- Register on the national portal (pmsuryaghar.gov.in) with your state, DISCOM, consumer number and mobile number.
- Apply for rooftop solar using your consumer number and email. The DISCOM checks technical feasibility.
- Choose a registered vendor, such as GR Enterprises, to install the system with DCR (domestic content) panels.
- Installation and net-meter: after installation, submit plant details and apply for the net-meter.
- Inspection and commissioning: the DISCOM inspects the plant and issues a commissioning certificate.
- Subsidy credit: submit your bank details and a cancelled cheque. The subsidy is credited directly, usually within 30–60 days.
Documents you'll need
- Latest electricity bill in the applicant's name
- Aadhaar card and PAN card
- Proof of ownership of the property / roof
- Bank passbook or a cancelled cheque
- Passport-size photograph
Who is eligible?
Any Indian household that owns a house with a roof suitable for solar, has a valid electricity connection, and has not received any other solar subsidy. Group Housing Societies and RWAs can claim ₹18,000/kW for common facilities.
Subsidy amounts and rules are set by the Ministry of New and Renewable Energy and may change. We always confirm current terms on the official portal before you commit.
Solar Knowledge Base
Subsidy questions, answered
Clear, transparent answers about PM Surya Ghar central subsidies, DHBVN/UHBVN net-metering approvals, storm-tested mounts, and 30 years performance warranty.
Which is better for a home: on-grid, off-grid or hybrid?
On-grid is best for most city homes with reliable power: it is the cheapest, qualifies for subsidy and uses net-metering. Hybrid adds battery backup for frequent outages. Off-grid suits locations without a grid connection.
Will solar work in monsoon or on cloudy days?
Yes, at a reduced output. Panels still generate on cloudy days, typically 20–40% of normal. Annual generation already accounts for monsoon months, so your yearly savings estimate stays accurate.
What is PM Surya Ghar: Muft Bijli Yojana?
It is the Government of India's rooftop solar scheme for households. It provides ₹30,000/kW for the first 2 kW and ₹18,000 for the third kW, up to a maximum of ₹78,000 for systems of 3 kW and above, credited directly to the homeowner's bank account.
Who is eligible for the subsidy?
Indian households with their own roof suitable for solar, a valid electricity connection in their name, and who have not availed any other solar subsidy. The system must be installed by a registered vendor using DCR (domestic content) panels.
How long does the subsidy take to arrive?
Usually 30–60 days after the net-meter is installed and the system is inspected. We file the application on the national portal and track it for you until it is credited.

Let us file your subsidy, start to finish.
Our solar engineers will inspect your rooftop, prepare an accurate generation report, and calculate your exact PM Surya Ghar subsidy — with zero sales pressure.
What happens during your site survey?
3-Point Rooftop Inspection Protocol
Free Onsite Rooftop Feasibility Survey
An engineer visits your property to inspect solar irradiance, roof orientation, and usable shadow-free terrace area.
Verified ROI & Generation Report
Transparent monthly generation forecast, Tier-1 equipment specifications, and payback model without hidden markups.
Zero DHBVN / UHBVN Bureaucracy
From submitting net-metering applications to coordinating DISCOM inspections and subsidy release — we manage everything.