Skip to content
GR Enterprises - Solar Powering a Brighter Tomorrow
Engineers inspecting a solar array on a commercial office rooftop in Gurugram

Commercial & industrial solar · Hisar, Haryana

Commercial solarin Hisar.

Hisar ke steel mills, auto markets, showrooms aur hospitals ke liye rooftop solar best investment hai. Din ke time heavy power bill ko 70% tak kam karein aur 3 saal me poora paisa vasool karein.
Sun hours/day
5.4
Units/kW/month
~130
Avg tariff
₹9.8
Rooftop feasibility survey

Free solar survey in Hisar

A solar engineer will call you within one working day.

+91

10-digit mobile number

Free surveyNo obligationYour number stays private

DURASOL AUTHORIZED DISTRIBUTORTATA · ADANI · UTL · EASTMAN TIER-1 SOLAR30-YEAR PERFORMANCE WARRANTY10*-YEAR INVERTER WARRANTYDHBVN & UHBVN NET-METERING HANDLEDPM SURYA GHAR DBT REGISTERED150 KM/H WIND GI STEEL STRUCTURESLIVE GENERATION MOBILE APP

Hisar solar economics

Plant sizes and savings in Hisar

Based on Hisar's average sunshine of 5.4 kWh/kWp/day and a commercial tariff of about ₹9.8/unit (DHBVN (Dakshin Haryana Bijli Vitran Nigam)).

Solar generation and savings by system size in Hisar
SYSTEMUNITS / MONTHSAVING / MONTHAPPROX. PROJECT COSTPAYBACK
25 kW3,240₹31,752₹11.50 L3.2 yrs
100 kW12,960₹1,27,008₹46.00 L3.2 yrs
250 kW32,400₹3,17,520₹1.15 Cr3.2 yrs

Indicative figures. Exact numbers depend on your roof, load and the equipment chosen.

Interactive Solar Yield & Subsidy Simulator

Calculate your 30-year solar savings & subsidy.

Move the slider to match your average monthly power bill and instantly see your recommended system size, subsidy, and lifetime returns.

Average Monthly Power Bill₹75,000
MIN ₹10,000MAX ₹10.00 L
Recommended Capacity

60kW

Roof Footprint

5,400 sq ft

Module Count

109 × 550 W

+ 49 MORE MODULES IN CAD LAYOUT

Monthly Power Bill Savings
₹71,250
Estimated Payback Horizon
3.2 years
Gross Capital Outlay (est.)
₹27.60 L
Tax Benefit (Accelerated Depr.)
40% Eligible*
30-Year Cumulative Yield
₹3.74 Cr
30-Yr CO₂ Footprint Avoided
2,160 tonnes

*Eligible under Section 32 of Income Tax Act for commercial tax depreciation.

Turnkey Engineering Protocol

From site survey to power generation in four weeks.

Every installation follows strict MNRE guidelines with zero-leakage chemical anchoring and certified wind-speed structures.

Solar engineer measuring a rooftop with a laser meter while the homeowner watches
DAY 1
01/DAY 1

On-Site Rooftop Survey

Certified solar engineer inspects roof orientation, shadow-free area, DISCOM sanction, and structural load feasibility.

Solar consultant showing a 3D rooftop design on a laptop to an Indian couple
DAY 2–4
02/DAY 2–4

Engineering Layout & Turnkey Quote

Custom 3D CAD layout with shadow analysis, expected monthly kWh generation, and transparent turnkey BOQ pricing.

Installers in safety harnesses fixing a solar panel onto its mounting structure
WEEK 2–3
03/WEEK 2–3

Net-Metering & Subsidy

Complete liaison for DHBVN/UHBVN bi-directional meter sanction and PM Surya Ghar national portal DBT subsidy filing.

Grandmother and son checking solar generation on a phone app on their terrace
30 YEARS
04/30 YEARS

Commissioning & Lifetime Care

Live mobile app telemetry, 30-year panel warranty, 10-year inverter warranty, and 5 years complimentary maintenance.

Verified Customer Reviews

What our customers say

Hear directly from families and commercial proprietors across Haryana who switched to rooftop solar with GR Enterprises and slash their electricity bills by up to 90%.

  • “Our 250 kW rooftop plant paid back in just over three years. The generation data matches the proposal they gave us, and their O&M team visits every quarter without us asking.”
    BILL: ₹5,20,000 → ₹2,10,000250 kW
    M
    Mehta TextilesAhmedabad · Industrial
  • “Power cost is a big line item for a clinic. The 40 kW system brought it down sharply, and the hybrid backup keeps critical equipment running during outages.”
    BILL: ₹98,000 → ₹34,00040 kW
    D
    Dr. Sameer KhannaGurugram · Commercial

Coverage & Reach

Complete Solar EPC Coverage Across Hisar & Surrounding Villages

GR Enterprises delivers direct on-site rooftop surveys, UHBVN/DHBVN net-metering liaison, and 30-year guaranteed installations across all sectors, colonies, tehsils, and rural village clusters in the Hisar region.

Urban Sectors & Colonies

Key residential and commercial sectors in Hisar

  • Model Town
  • Sector 14
  • Urban Estate II
  • PLA
  • Sector 9-11
  • Auto Market
  • Tohana Road
  • Camp

Tehsils & Rural Villages

Rural Subsidy

Direct village surveys & agricultural tube-well solar

  • Model Town
  • Sector 14
  • Urban Estate II
  • PLA
  • Sector 9-11
  • Auto Market
  • Tohana Road
  • Camp
Rural Solar Service Commitment

Living in a village or farmhouse near Hisar?

Our certified solar engineers bring digital shadow-analysis and rooftop feasibility vans directly to your village within 24 hours. We handle full rural domestic net-metering paperwork with DHBVN (Dakshin Haryana Bijli Vitran Nigam) sub-divisional offices, agricultural tube-well solar installations, and high-wind structural reinforcements.

100% Free Survey · No Obligation

Solar Knowledge Base

Commercial solar in Hisar: FAQs

Clear, transparent answers about PM Surya Ghar central subsidies, DHBVN/UHBVN net-metering approvals, storm-tested mounts, and 30 years performance warranty.

Need immediate technical guidance?Call an engineer at +91 72909 08088

What is the payback period for commercial solar in Hisar?

With an average commercial tariff of about ₹9.8/unit in Hisar, most businesses recover the cost of a rooftop plant in 3–4 years. After that, the plant generates practically free electricity for 20+ years.

How much can a 100 kW solar plant generate in Hisar?

A 100 kW plant in Hisar generates roughly 13,000 units a month, saving about ₹1.27 L a month at current commercial tariffs.

Is net-metering available for businesses in Hisar?

Net-metering and gross-metering eligibility depend on DHBVN (Dakshin Haryana Bijli Vitran Nigam) regulations, your connection category and sanctioned load. We check feasibility during the site survey and handle the full approval process.

Do you offer zero-investment solar for businesses in Hisar?

Yes. For loads of about 100 kW and above, we can offer a RESCO/PPA model in Hisar: you pay only for the units generated, at a tariff below your DISCOM rate.

What is the payback period for commercial solar?

With commercial tariffs of ₹9–11 per unit, most businesses recover their investment in 3–4 years. After that, the plant generates practically free electricity for 20+ years.

Can my business claim depreciation on solar?

Yes. Solar plants qualify for accelerated depreciation under the Income Tax Act, which lowers your effective cost further. Please confirm the current rate and your eligibility with your chartered accountant.

Do you offer zero-investment (RESCO/PPA) models?

For larger industrial loads, typically above 100 kW, we can arrange OPEX/RESCO models where you pay only for the units generated, at a tariff lower than your DISCOM rate, with no upfront investment.

Will installation disrupt our operations?

No. We plan installation around your shifts, and the switchover to solar takes a short planned shutdown, usually scheduled on a weekly off.

Complimentary On-Site Solar Feasibility Survey

Book a free solar survey in Hisar.

Our solar engineers will inspect your rooftop, prepare an accurate generation report, and calculate your exact PM Surya Ghar subsidy — with zero sales pressure.

What happens during your site survey?

3-Point Rooftop Inspection Protocol

01

Free Onsite Rooftop Feasibility Survey

An engineer visits your property to inspect solar irradiance, roof orientation, and usable shadow-free terrace area.

02

Verified ROI & Generation Report

Transparent monthly generation forecast, Tier-1 equipment specifications, and payback model without hidden markups.

03

Zero DHBVN / UHBVN Bureaucracy

From submitting net-metering applications to coordinating DISCOM inspections and subsidy release — we manage everything.

Zero buying obligationCertified engineer visit